Inter-County Energy and 16 owner-member cooperatives along with EKPC, are required by the Public Utility Regulatory Policies Act (PURPA) of 1978 to provide qualifying facilities (QFs) access to its electric grid. The requirements for QFs to gain access to the electric grid system are outlined in the following documents:
- EKPC Facility Connection Requirements for Transmission
- Small Generator Direct Interconnection with Member System Manual
- EKPC Attachment 4 to Small Generator Direct Interconnection
- Cogeneration Tariff 03-31-2022_Update.pdf
- NERC Interconnection Requirements for Variable Generation
If you are a member of Inter-County Energy and are interested in submitting an application for Co-Generation, select Co-Gen. By clicking, you will have access to the Real-time EKPC Residual Aggregate LMP$/MWh information.